The job on on I do monthly mapping and bi weekly panos and progressions.
I have 140 acre job site, and do the mapping from 300 feet.
I have 13 panos that I do at 200 feet.
The Superintendent attempts to zoom in and get fine detail from both mapping and panos. I'm also dealing with three 225 foot cranes.
My question is, what altitudes to you guys do your mapping and how much overlay do you use, my mapping is running about 640 photos. Each pano is 34 photos.
Also what lens are you using. I'm flying the Inspire 2
I have 140 acre job site, and do the mapping from 300 feet.
I have 13 panos that I do at 200 feet.
The Superintendent attempts to zoom in and get fine detail from both mapping and panos. I'm also dealing with three 225 foot cranes.
My question is, what altitudes to you guys do your mapping and how much overlay do you use, my mapping is running about 640 photos. Each pano is 34 photos.
Also what lens are you using. I'm flying the Inspire 2